Previous Concrete Repair Projects

Observatory Bridge - Reedy Creek

 

After problems with the under side of the brdge with carbonation and steel coverage BRD were engaged to rectify the problem, we sand-blasted the underside of the bridge structure then we epoxy injected all the cracks, we then applied over 10 tone of Vandex BB75 elastaseal and 5 tone of unimortar to protect the bridge from any future spalling or carbonation problems it  ay have had in the future.

 

observatory     observatory_1     observatory_3

 

 


 

 Wooloowin Tunnel - Brisbane

 

rehabilitation of a 2.6m diametre main storm water line for Brisbane City Council. These works consisted of break out and replacement of oxidized steel reinforcement affected concrete pipe sections and repair of the oxidized stel reinforcement with the use of the Sika Cementitious Monotop 615HB and Monotop 610 Repair System.

 


 

Focus Apartments - Surfers Paradise

 

Stage three of the concrete rehabiliation program to the external building facade. These works consisted of break out and replacement of oxidized steel reinforcement affected concrete sections and repair of the oxidized steel reinforcement with the use of the Sika Cementitious Monotop 615HB and Monotop 610 repair system.

 

017     focus_002     02042008682

 

 

 


 

 

Paradise Towers - Surfers Paradise

 

One of the Gold Coast's oldest buildings. BRS preformed major concrete repair and repainting of all exposed concrete sections inclusive of balconies. ledges, soffits and floor slab ends.

 

14112007242      p4300023     morocan_roof_022

 

 


 

 

Buderim Ginger - Buderim

 

Brs were contracted for maintenance work after the inspection of the suspended walkway. Corrosion of the steel reinforcing in the suspended concrete walkway was to extensive to repair. The most economical solution was to remove the structure and replace it with timber.

Also we repaired the concrete and lining defects to the exterior and interior walls of the concrete holding tanks.

 

budgreim_gingar_021     budriem_ginger_021     budriem_ginger_022

 

 


 

 

 The Exchange Hotel - Brisbane

 

Injection of the Sika Sikadur 52 low vescosity Epoxy Resin Injection System into 68 lineal meters of concrete floor cracks.

 

the_exchange_hotel_004_400     the_exchange_hotel_013_400     the_exchange_hotel_019_400

 


 

Surfers Fairways - Surfers Paradise

 

BRS was contracted to rectify the concrete defectsand bar ends in the concrete on both the east and west buildings.

Traditional concrete repair methods as per Australian Standards for spalling concrete repairs are used in conjunction with a registered repair system integrating all of the current advanced materials technology.

 

22022008516_400     dsc00011_400     p060608_13.08_400

 


 

Condor Apartments - Surfer Paradise

 

To repair the severely spalled concrete areas to the balcony edges of the building with the use of Sika Mono Top 615HB High Build Cementitious Repair Mortar, Sika Grout 212HP High Strength Grout and the Sika Quick 2500au Rapid Hardening Repair Mortar.

 

p161208_11.49_400     p161208_11.52_400

 


 

Breakers Apartments - Surfers Paradise

 

BRS was contracted to carry out remedial repairs to concrete defects in the 1st level main bedroom sliding door hobb wall, the internal floor substrate at the base of bedroom 2 balcony sliding door in unit 66 and concrete defects and water ingress problems on the external east facing wall of unit 64 and the north east facing balcony hobb wall of unit 66.