Previous Podium Refurbishment Projects
|
Sunbird Resort - Surfers Paradise
Podium Refurbishment
BRS have currently completed the Podium Refurbishment works on the ground floor main enterance, indoor/outdoor pool area to rectify the corrosion to columns, leakage under the pool wall lining. Also replace the glazing to the windows and relocate the planter boxes
|
|
Morrocan Resort - Surfers Paradise BRS removed over 1000tonne of dirt, plants pavers, etc. from the south side podium deck, then installed a Two Layer Tremco Antirot Torch on Membrane System to over a 1000m2. After the completion of installation of the membrane and drainage system we back filled the podium area reinstated all fencing, grass areas and repainted the surrounding walls.
|
|
Phoenician Spa Resort BRS has recently completed a major refurbishment to the poodium deck on one of the Gold Coasts largest resorts. After years of water problems into shops below and a podium deck that was largely un-useable and looking tired The Phoenician body corporate decided to do an extensive upgrade. They transformed the podium deck into a modern new bbq area, sun baking areas, refurbished the water features and the pools. BRS also carried out a major removal and replacement of a new waterproofing system to the main tower roof back in 2001, works included the removal of 80tonne of dirt, pavers and trees then installing and Emerclad Waterproofing System.
|
|
|
|
|
|
|


