DeVille Apartments - Surfers Paradise

 

Window Replacement

 

BRS were contracted to remove and replace windows to bedrooms, kitechens and two sliding doors per unit.

 

All opening were protected by hoarding for overnight protection and swing stages were used for the hoarding and access to each level, which was all compliant with new Workplace Health and Safety requirements.

 

deville_1_400      deville_2_400     deville_3_400


 

Ocean Sands - Surfers Paradise

 

Building Repaint

 

The defects identified ranged from paint delamination, bubbles and discolourations to drummy, bulging spalling render, cracks and isolated rust spots.

 

Paint defects appear to be a result of inadequate substrate preparation, lack of primer and possibly also initial painting 'green' render surface causing alkalinity attacks.

 

Render defects have mostly been caused by lack of adhesion/proper banding to substrates. Hairline cracks had also occured under the protruding concrete slab edges at each level. This type of cracking has most likely been caused by creep/deflection of slab edges applying pressure to the block wall infill panels, causing the render to crack.

 

ocean_sands_400_01     ocean_sands_1_400     ocean_sands_2_400

 


 

Wesley Hospital - Brisbane

 

Refurbishment of all external planter boxes, including removal of all soil, plants and tiling. Concrete repair to all spalling concrete, removal of all existing membrane with full Emerclad System, as supplied by Parchem Products.

 

wesley_hospital_012     wesley_hospital_011     wesley_hospital_028


 

 Peninsula Apartments - Surfers Paradise

 

Sliding door and window refurbishment. These works consisted of the replacement of all door and window roller systems, installation of anti lifting kits for safety and security purposes, refurbishment of existing handrails and reconstruction of window and door frames where required.

 

peninsula_windows_028     peninsula_windows_037     peninsula_windows_038

 


 

 

Acapulco Resort - Surfers Paradise

 

Replacement of window frames. These works involved the removal of a selection of a corrosion affected window frames from the east side of the building structure and installing new powder coated window frames and windows which allow for the reduction in wind and environment noise as wel as maximum waterproofing.

 

100_0314     pa120024_400     pa120025

 


 

 

Cashelmara - Surfers Paradise

 

BRS were contracted to repaint the interior doors and walls of the main foyer and office areas, also to replace the old baustrades with new aluminium and glass balustrade systems, and the installation of new sheet membrane waterproofing systems to roof top areas consisting of approximately 600m2. 

 

p211108_12.4001_400     p031108_12.4601_400     p211108_12.37_400 

 


 

 

 

Cumbrie Apartments - Noosa

 

BRS preformed a complete external and stairwell repaint, which included the high pressure clean of the walls, repair of cracks using Everflex Water Based Sealant. 

 

p1000141_400     p1000144_400 

 


 

 

 

Stella Maris - Ballina

 

Buidling Rectification Services transformed the block of units from looking old and run down to modern and stylish by preforming works on the toilet and shower areas, the external lighting, carports, windows and sliding doors, tiling of the stair well, balconies and balustrade, some internal painting and a complete external repaint.

 

29022008547_400     12022008469_400     p300708_14.51_400 

 


 

 

Suncorp Stadium - Brisbane

 

 


 

 

Golden Gate Apartments

 

BRS rectified repairs to the coating system by using Dulux 955 Acretex Membrane System and a complete external building repaint.

Concrete and bar repairs on the underside of unit balconies were also rectified.

The restaurant enterance and roof underwent repairs and upgrades as did several of the penthouses, the roof water tank and the south east side windows. 

 