Current Projects
Cedar Lakes Resort
Building Rectification Services has been contracted for the removal of over 5000m2 of existing dirt and membrane from the concrete roof structures and Installation of a multi layer torch on membrane system (Supplied by Parchem) with stone ballast finish over the top of the membrane system.

Wooloowin Tunnel
Rehabilitation of a 2.6m diameter main storm water line for Brisbane City Council. These works consists of break out and replacement of oxidized steel reinforcement affected concrete pipe sections and repair of the oxidized steel reinforcement with the use of the Sika cementitious MonoTop 615HB and MonoTop 610 repair system.
Wesley Hospital
Refurbishment of all external planter boxes, including removal of all soil, plants and tilling. Concrete repair to all spalling concrete, removal of all existing membrane and re-membrane with full Emer Clad system. As supplied by Parchem products.
Southport Central
Building Rectification Services are contracted to install over 5000m2 of Paraseal LG Bentonite Blanket to the basement car park then install approximately 3000m2 of waterproofing to the podium deck planter boxes, balconies and roof deck areas.

Focus Apartment
Stage three of the concrete rehabilitation program to the external building façade. These works consists of break out and replacement of oxidized steel reinforcement affected concrete sections and repair of the oxidized steel reinforcement with the use of the Sika cementitious MonoTop 615HB and MonoTop 610 repair system.

Paradise Towers
One of the Gold Coast oldest buildings is under going major concrete repair and repainting of all exposed concrete sections inclusive of balconies, ledges, soffits and floor slab ends.

Peninsula Apartments
Sliding door and window refurbishment. These works consists of the replacement of all door and window roller systems, installation of anti lifting kits for safety and security purposes, refurbishment of existing handrails and reconstruction of window and door frames where required
Acapulco Resort
Replacement of windows frames. These works involve the removal of a selection of corrosion affected window frames and windows from the east side of the building structure and installing new powder coated windows frames and windows which allow for the reduction in wind and environment noise as well as maximum water proofing.